
Oyo-Iseyin rehabilitation road project
June 10, 2021
Fit-Out Work in Victoria Island, Lagos.
May 5, 2020Project Gallery

Click on the images below to launch gallery
- Proposed Omole Phase 2 site where collector drain is to be situated
- Previous state before Drainage work commenced
- Excavation in progress
- Casting of the base of Retaining Wall Cascade
- Construction of 30m retaining wall in progress
- Men at work
- Construction of Lower Drain Channel in progress
- Construction of Lower drain channel
- Retaining Wall Cascade
- Ongoing casting work at Omole phase 2 collector drain
- Construction of Lower line drain in progress
- Backfilling of upper drain